Goal of Transmission & Distribution Facility management
적용사례
2019_Bangladesh, West Zone(WZDC) GIS & DAS pilot project
Applications of the Electric Package (Digital Twin)
EP Positioning
EP Components
EP Components - Main Functionality
- Analysis of Power Line Operation State
- Forecast of Long-Term Demanding
- Electric Network Construction Planning
- Advising Optimized Providing Way with Spatial Analysis
- Project Priority Selection and Budget Compilation Support
- Managing High-Voltage Systematic Map / Load Density Map
- Distribution Construction Process Control
- Electric Current Flow and Fault Location Analysis integrated with DR.
Results of Electric GIS & DIS works
Category | Before | After | Improvement Rate |
Low-voltage Design | 310 Min / ea | 10 min / ea | 96.8 % |
High-voltage design | 310 Min / ea | 130 min /ea | 58.1 % |
Reporting of Facilities | 70 min / ea | Automatic | 100 % |
Distribution Planning | 15 days | 1 day | 93.3 % |
Maintenance | 4 hour /ea | 1 hour / ea | 75.0 % |
Benefits of Electric GIS & DIS
- Reduce the Budgets & Cost
- High Efficiency of the Facility Management Work
- More powerful Service for Customers
- Ability to Represent ‘Real World’ and Acquired Systems in GIS
- Provides Flexible Tool for Future Data Sharing and Employee Effectiveness
- Full Experience of Electric Company